Revised plans for Conservation.  The Commission requested a revision of the location of the mitigation and the applicant responded with the proposal to remove the lawn within the velocity zone (VE) and the relocation of some mitigation plants there.  The originally submitted plans are below.

Alternatively, PDFs can be downloaded:

Pages 1 & 2

Pages 4 & 3

 

Originally submitted drawings: