40 BOB WHITE LN

Resolution of open Order of Conditions

Jo & Laurinda Raquel
Campino Enterprises LP

40 Bob White Lane, Harwich
Map 17, Parcel R4

DEP SE 21-1958
OOC, Deed Book 23167, Page 122

·         Plan entitled Site Plan of Land 40 Bobwhite Lane, Harwich, MA, dated 07-20-2008, prepared by J.C. Ellis Design, Signed and Stamped by Joseph H. Rego, PE and Jason C. Ellis, RS.

·         Demolition and reconstruction of house in same footprint with new foundation.

·         Subject to Harwich By-Law Article VII

·         Issued 09-04-2008, Expired 09-04-2011

·         Roof runoff to drywells

·         AS-BUILT plan required

DEP SE 32-1958
AOC, Deed Book 24146, Page 124

·         Plan entitled Site Plan of Land 40 Bobwhite Lane, Harwich, MA, dated 07-20-2008, prepared by J.C. Ellis Design, Signed and Stamped by Joseph H. Rego, PE and Jason C. Ellis, RS.

·         Plan entitled Site Plan 40 Bob White Lane, Harwich, MA – T. Varnum Philbrook, PE, dated 09-24-2009

·         The revised plan incorporates a propane tank on a concrete pad with mitigation.

·         Mitigation includes removal of 160 SF concrete pad at the rear of the structure and revegetation and conversion of 160 SF of gravel drive into native plants.

·         Expired 09-04-2011

DEP SE 32-1958
AOC, Deed Book 25015, Page 83

·         Plan entitled Site Plan of Land 40 Bobwhite Lane, Harwich, MA, dated 07-20-2008, prepared by J.C. Ellis Design, Signed and Stamped by Joseph H. Rego, PE and Jason C. Ellis, RS.

·         Plan entitled Site Plan 40 Bob White Lane, Harwich, MA – T. Varnum Philbrook, PE, dated 09-24-2009

·         Plan # 3 Second Revision – Proposed Amendments & Plans Packet Containing Landscape & Utility Line Construction by Mark O’Neil, Contractor 10/7/2010

·         The second amendment allows for various landscaping changes.

·         The Autumn Olive will be removed by the cut and paint application method.

·         The leachfield will be inspected prior to replanting of new plants for any deficiencies.

·         The utility trench as it goes through the marsh will be dug by hand and that portion of excavation will be inspected after one year for growth of vegetation.

·         The pole in the marsh will be removed by hand only using hand tools.

·         No split rail fence will be extended into resource areas.

·         Issued 11-17-10, Expired 9-4-11